国产尤物一区在线不卡_毛片黄久久久免费观看_不卡一区二区乱在线观看_亚洲波霸中文字幕美国服务器_亚洲网站精品在线观看_亚洲日本精品国产第一区_在线看不卡av婷婷_边摸边吃奶边做免费视频_人妻无码专区好紧_伊人影院国产热门在线午夜

News

Huaibei Traffic Control

A company dedicated to the research, development and application of new support and reinforcement technology and products

※ Your current location:Home - News - News update

What are the commonly used support and reinforcement technical measures outside the dug tunnel

Published:2022-12-10      Clicks:329

Shoting-anchor excavation method refers to the construction method of tunnel construction by excavation of underground tunnel. It is a traditional construction method. The tunnel lining of shotanchor excavation method is also known as the supporting structure. Its function is to strengthen the surrounding rock and form a tunnel structure system with sufficient safety with the surrounding rock to jointly bear various loads that may occur, maintain the use of tunnel section clearance, prevent the surface subsidence, provide a smooth surface for air circulation, block or drain groundwater.


The basic structure of tunnel lining with shotanchor excavation method is composed of primary support, waterproof isolation layer and secondary lining. The outer layer of compound lining is the primary support, whose function is to strengthen surrounding rock, control surrounding rock deformation, prevent surrounding rock loosening and instability, and is the main bearing unit in the lining structure. Generally, it should be applied immediately after excavation and should be close to surrounding rock. Therefore, the most suitable use of shotcrete anchor support, according to the specific situation, the choice of bolt, shotcrete, steel mesh and steel support single or combined.


Previous:The use of concrete accelerator
Next:What are the common support and reinforcement technical measures outside the dug tunnel?

Back to list

News you may be interested in POPULAR INFORMATION